T&M
|
제품특징 | 제품사양 | 자료실 |
- To save setup time and thus expensive test costs, devices are largely prepared in the preparation or the workshop.
- The sensors are being connected to the measuring system, joined by the supply and fieldbus.
- Then, the whole device including the operational measuring system is brought to the test room on a pallet.
- The test will be faster and saves a lot of preparation time inside the test room.
제품특징 | 제품사양 | 자료실 |